Choose Bank Transfer (BACS)
Add your items, enter your delivery details and select Bank Transfer at checkout.
Place your order in three simple steps using Bank Transfer (BACS).
Add your items, enter your delivery details and select Bank Transfer at checkout.
We will email your confirmation and prepare the pro-forma using your order reference.
Use the bank details supplied with your order. We will dispatch once cleared funds are received.
Assembly Hub Wall systems
Choose the right fixings for your wall before you fit slatwall, grid mesh, arms or rails.

Your box includes printed instructions for your exact model. This guide is an overview to help you get it right first time. If anything differs, follow the printed sheet.
Knock on it. A solid sound is usually brick or block. A hollow sound is plasterboard on studs. Plasterboard stuck straight onto brick with blobs of adhesive is called dot and dab.
Run a detector over the area. Never drill directly above, below or beside sockets and switches.
Add up the fixture and everything you'll put on it, then use fixings rated well above that weight.
Drill with a masonry bit, push in wall plugs, then screw the fixture on.
Fix into the timber or metal studs wherever you can. Between studs, use heavy-duty cavity fixings, never plain plugs.
Use fixings long enough to reach the brick behind the gap, or dedicated dot and dab fixings.
Use a spirit level, tighten everything, and test with a firm pull before loading.
No. Wall arms, grid mesh brackets, flanges and slatwall need fixings chosen for your wall, so they're not supplied.
If you're unsure about your wall or you're hanging heavy loads, yes. It's quick and worth it.
Have your order number ready and tell us which product you are building. We are open Monday to Saturday, 9am to 6pm.